Home »

Scope
A robust offshore lifting assessment was required for a time critical task of shifting ESD modules from an offshore barge onto offshore process platform
The detailed scope of work involved following tasks:
- Prepare modelling and conduct lifting analysis for movement of ESD Module from Barge to Offshore Platform.
- Ensure suitable Offshore Code compliance.
- Design the rigging arrangement and produce drawings.
- Prepare the lifting procedure supported by analysis.