Offshore Lifting Assessment

Home » Offshore Lifting Assessment

Scope

A robust offshore lifting assessment was required for a time critical task of shifting ESD modules from an offshore barge onto offshore process platform

The detailed scope of work involved following tasks:

  • Prepare modelling and conduct lifting analysis for movement of ESD Module from Barge to Offshore Platform.
  • Ensure suitable Offshore Code compliance.
  • Design the rigging arrangement and produce drawings.
  • Prepare the lifting procedure supported by analysis.

 

Our Services

Fpso,Is,Floating,Production,Storage,And,Offloading,Facility,Located,At

Offshore Engineering

Aerial,View,Oil,And,Gas,Tanker,Cargo,Ship,Offshore,At

Marine Engineering

3d,Rendering,Of,A,Subsea,Production,Manifold,Being,Inspected,By

Subsea Consulting

Renewables

Renewables